View Full Version : Bay Street Reconfiguration



ctf
11-20-2015, 11:50 AM
"The most recent cost estimate for the conversion is $3.1-million but the assessment suggests there will be long-term cost savings due to reduced snow removal, line-painting and future resurfacing."

So there is no intention to clear the snow from the multi use path they intend on putting in? I am sure the walkway will not clear itself and will be a little more labour intensive. Plows can currently clean all four lanes at once, now there will be separate equipment and much more sand (it is a walkway) required.

Chachinga
11-20-2015, 05:20 PM
Whoever thought this one up needs a reality check.
Bay street is just fine the way it is, beside the fact that there are dozens of streets in dire need of repair before anything else should be considered.